Login   |   Register   |   

Handbags   (The sad, the bad and the ugly. Non-productive stuff here.)

Started by: tonker (27907) 

This week, I've been in Spain for six days doing a roof. I've mixed 3 tons of concrete and carried it, in buckets, up a scaffold onto a 5 metre high 'beam and pot' roof. Laid the concrete and then carried about two tons of Arabic clay tiles up the scaffold and laid half of them. All by myself, and I'm 58, NOT old!

Replied: 1st Oct 2016 at 18:35

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.17.150.163) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.