Login   |   Register   |   

Handbags   (The sad, the bad and the ugly. Non-productive stuff here.)

Started by: PeterP (11306)

On the 18th May I reported a deep rut approx 5ft long in the carriageway at the Bird In Hand Hindley.Deep enough to throw a cyclist off is/her cycle. A inspector so called found the pothole and said it would be filled in within 14 days.Job so called done Reported it again on the 21st June and it still has not been filled in .It is not hard to find and when you drive over from Liverpool rd to Market st it feels like you are driving over a cattle grid

Replied: 30th Jun 2021 at 15:37

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.138.118.250) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.