Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: fossil (7728)

I noticed that the above building company from Beijing who are the appointed contractor for the Wigan Galleries redevelopment have been replaced as contractor for Phase 3 at Middlewood Locks in Salford,following on from their withdrawal from the huge Bolton redevelopment.
So what are the chances of them being replaced in Wigan?

Replied: 9th Nov 2021 at 16:22

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (18.119.104.238) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.