Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: Tommy Two Stroke (15199)

Bolton Council, never had or has any interest in building the final half mile of that link road through Bolton territory, because they cannot and could not see of it being any benefit to Bolton, and that was why AGMA and TFGM were set up to integrate the transport infrastructure, throughout the Greater Mankland area, regardless of local authority boundaries.
Take the guided busway from Leigh to Manchester, it runs through Wigan Metro, apart from the last few hundred yards, when it is in Salford, before TFGM, if Wigan had asked Salford to build the last bit of the busway, Salford would have told Wigan to eff off

Replied: 14th Jan 2022 at 15:27

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.227.239.9) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.