Login   |   Register   |   

General   (General discussion, talk about anything.)

Started by: wigvet (3550)

Tonker – the masts have been installed for the imminent 10 week project on re-waterproofing Gathurst Viaduct as Highways England attempt to rectify the ‘cock-up’ they made on the same scheme last Autumn. The job at the time was going that bad:
i) surfacing was laid without any waterproofing underneath – all that has now to be ripped up
ii) the temporary lanes southbound were set out incorrectly so all HGVs had to divert through Wigan!!

Lets hope they get it right this time eh?

And Jarvo the term ‘Death Valley’ is used on the Motorway network in reference to the Irwell Valley, junctions 15-16, on the M60 (M62 what was)

Replied: 7th Jun 2018 at 10:31

Report Abuse

Only use this form to report abuse about the post displayed above. If you have a query or wish to make a comment, do not use this form.

Your IP No. (3.137.178.133) will be logged.

* Enter the 5 digit code to the right of the input box. Don't worry if you make a mistake, you will get another chance. Your comments won't be lost.