Wigan Flood Alleviation (FAS) Phase 1&2.

Before Wigan Dam started.2009
Before Wigan Dam started.2009
No Comments
Wigan FAS start-Robin Park.(31-07-2007)
Wigan FAS start-Robin Park.(31-07-2007)
No Comments
Prior to Flood alleviation works commencing-31-07-2007.
Prior to Flood alleviation works commencing-31-07-2007.
No Comments
Alongside the bus depot viewed from Cudworth Street(31-07-2007)
Alongside the bus depot viewed from Cudworth Street(31-07-2007)
No Comments
River Douglas existing protection 31-07-2007.
River Douglas existing protection 31-07-2007.
No Comments
Raising the footpath by Asda Carpark 07-09-2007.
Raising the footpath by Asda Carpark 07-09-2007.
No Comments
Melverley Street- the contractors office setup for Wigan FAS.30-10-2007
Melverley Street- the contractors office setup for Wigan FAS.30-10-2007
No Comments
Looking towards Adams railway viaduct.30-10-07.
Looking towards Adams railway viaduct.30-10-07.
No Comments
Can anyone remember the old footbridge that was here?
Can anyone remember the old footbridge that was here?
13 Comments
11-12-07-view from the offices.@Melverley Street.
11-12-07-view from the offices.@Melverley Street.
No Comments
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 1
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 1
5 Comments
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 2
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 2
No Comments
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 3
Wigan Flood Alleviation (FAS) Phase 1&2 old Footbridge 3
1 Comment
Cobbled Path at the side of the river.
Cobbled Path at the side of the river.
1 Comment
Cobbled Path and steps at the side of the river.
Cobbled Path and steps at the side of the river.
No Comments
18-12-2007-Contractors Access footbridge for piling works at the Bridge.
18-12-2007-Contractors Access footbridge for piling works at the Bridge.
No Comments
Piling for the new footbridge support base. 18-12-2007
Piling for the new footbridge support base. 18-12-2007
No Comments
Underneath the Arches-04-01-2008
Underneath the Arches-04-01-2008
1 Comment
The new RC protective river wall.-04-01-2008.
The new RC protective river wall.-04-01-2008.
No Comments
Piling for the new footbridge
Piling for the new footbridge
No Comments
Crawler Crane used to hang the piles & hammer at the bridge.
Crawler Crane used to hang the piles & hammer at the bridge.
No Comments
River Douglas floods-16-01-08.@10.43am.
River Douglas floods-16-01-08.@10.43am.
No Comments
The Douglas floods into the works compound.16-01-08.
The Douglas floods into the works compound.16-01-08.
No Comments
16-01-08. The Douglas in flood heading towards Adam Bridge & Asda.
16-01-08. The Douglas in flood heading towards Adam Bridge & Asda.
No Comments
The Floods of 16-01-08.-Melverley Street Bus Depot from the river bank.
The Floods of 16-01-08.-Melverley Street Bus Depot from the river bank.
2 Comments
16-01-2008.Adam Bridge & flooded River Douglas.
16-01-2008.Adam Bridge & flooded River Douglas.
1 Comment
View from the opposite river bank towards Melverley Street & bus depot.
View from the opposite river bank towards Melverley Street & bus depot.
No Comments
16-01-2008.Turbulent waters -by the site of the new foot bridge.
16-01-2008.Turbulent waters -by the site of the new foot bridge.
1 Comment
16-01-2008. Flood waters subside.
16-01-2008. Flood waters subside.
No Comments
27-02-2008-New footbridge installed.