wiganworld home page
Home Photos of Wigan Stuff News What's on Classifieds Forum Communicate Guestbook Links
 Search    In association with  The Wigan Courier
  Album
 Album contents
  Walking days
  Schools
  Work
  Street scenes
  Places
  People
  Sports
  Assorted
 
  Upload Your Photos
 
More photos of Wigan
  New gallery
  Old gallery
  Wigan streets
  Photo-a-Day
  Wiganers at Work
 
Webcam
  wiganworld webcam
 
 
Wigan Flood Alleviation (FAS) Phase 1&2.   Views: 280
16-01-2008.Adam Bridge & flooded River Douglas.   Comments: 1
Photo: Barrie.   Item #: 31738  
 
16-01-2008.Adam Bridge & flooded River Douglas.

Alert Image scaled down from 1000px to 750px wide Click here, or click the photo to view original
 
  As one can see the flood waters didn't quite reach the soffit of the bridge that morning. This view has changed in the past 12 years with the new road layout.  

 [<< Back] 1 user comment(s) below:-  [Leave a comment]

Comments by Sir Bob, 4th January 2020  
In the year 2000 there were floods down there then, when the river was actually higher than in the photograph, when the river was actually covering the bottom of that bridge to a depth of about six inches, but the next bridge along to it, which was built as part of the 1999 Saddle Gyratory Junction Scheme, and that bridge was not touched by the river, and by comparing the two bridges at that time, it looked like the new bridge outside of Asda, had been built to be about eighteen inches higher than the existing Adam Bridge, which was nearly underwater, and at the time I had walked down to Newtown to view the flooding, because the traffic was gridlocked, with the road under the Seven Stars railway bridge being closed, due to it being flooded to a depth of about three feet by the floodwater.

 
 © 2020 wiganworld
Click here to read the privacy policy, disclaimer and copyright information.
Please contact us with your ideas, suggestions, moans or questions.