Wigan Flood Alleviation (FAS) Phase 1&2.

No Comments

Crawler Crane used to hang the piles & hammer at the bridge.
Crawler Crane used to hang the piles & hammer at the bridge.
Photo: Barrie.
Views: 2,076
Item #: 31685
This crane was transported to site by a heavy low loader through the bus depot and erected in an area at the back of the buildings.Due to poor ground conditions between the bus depot and River Douglas, This special crane pad was built to take the weight of the crane during it's working period. At the end of the period, the dismantling was the reverse action.